<li id="4oooo"><tt id="4oooo"></tt></li><li id="4oooo"><tt id="4oooo"></tt></li>
  • <li id="4oooo"><tt id="4oooo"></tt></li>
  • <tt id="4oooo"></tt>
  • <li id="4oooo"><table id="4oooo"></table></li>
    <li id="4oooo"></li>
    Home>>

    CPEC hydropower project achieves second-stage river closure (4)

    (Xinhua) 10:02, May 01, 2021
    CPEC hydropower project achieves second-stage river closure
    Workers dam the river to achieve the second-stage river closure in Mansehra district, Pakistan, April 30, 2021. Pakistan's Suki Kinari (SK) Hydropower Project in the northwestern part of the country achieved the second-stage river closure on Friday, entering a new phase of its dam construction. The successful cut of the Kunhar River's main riverbed with the river being diverted to spillway is to create free-from-water working areas for construction of concrete dam of the power station under the China-Pakistan Economic Corridor (CPEC), located in the Mansehra district of the South Asian country's Khyber Pakhtunkhwa province. (Xinhua/Li Hao)

    【1】【2】【3】【4】【5】

    (Web editor: He Zhuoyan, Bianji)

    Photos

    Related Stories

    久久精品视频免费试看